Harrow Green was appointed by the Ministry of Defence (MOD) to provide a secure, controlled storage solution during a major building refurbishment programme.
The requirement involved removing and storing office furniture from a single location to create the space required for external contractors to complete the refurbishment works. Approximately 44,750 cubic ft of assets were transferred into storage, occupying 179 wooden storage containers.
The programme was expected to run for approximately 12 months, after which assets would be returned to the refurbished building in phases. Harrow Green provided an end-to-end service encompassing packing, protection, collection, secure storage, digital inventory management and phased return logistics.
Client: Ministry of Defence
Location: UK wide
Sector: Government / Defence
The Challenges
The principal challenge is the variable and often fast-moving nature of IT deployment programmes.
Volumes can range from a single item to several hundred assets at short notice, requiring Harrow Green to maintain sufficient storage capacity and resource while still meeting agreed processing times.
Each item must also be accurately identified and recorded. Some equipment requires unpacking so that asset tags can be applied in a specific location, before being repacked and placed into storage.
With multiple suppliers feeding equipment into the programme, maintaining accuracy, traceability and consistent data quality is critical.
The Solutions
Before leaving site, assets were securely wrapped and protected, labelled and digitally inventoried, providing the MOD with clear visibility and traceability throughout the storage period.
Harrow Green allocated sufficient warehouse capacity in advance, ensuring the client’s assets could be accommodated as the programme accelerated. The warehouse team provided significant operational support, with incoming assets recorded on the inventory system within 24 hours of receipt.
Assets were maintained within a controlled storage environment, supported by regular temperature monitoring and reporting and digital auditing. Individual items remained retrievable when required, rather than the storage operating as a closed bulk-storage solution.
The team remained flexible as timescales changed, adjusting warehouse resources and collection schedules to enable the accelerated programme to continue without affecting the wider refurbishment works.
The Outcomes
Harrow Green completed the transfer into storage ahead of the original programme, providing the client with the certainty and space required to begin refurbishment works sooner.
The managed solution gave the MOD continued visibility and access to its assets throughout the storage period, while protecting furniture for future reuse rather than requiring unnecessary replacement or disposal. Where appropriate, redundant materials were also directed for recycling.
With phased returns planned as areas of the refurbished building became available, Harrow Green continued to support the client beyond the initial collection and storage phase.
The success of the programme also contributed to a wider ongoing relationship, with multiple additional projects secured for the account.
Rather than simply providing warehouse space, the project demonstrated Harrow Green’s ability to combine secure storage, specialist handling, digital inventory management, environmental monitoring and project logistics into a single managed solution for a complex and security-sensitive client.