Phased Warehouse, Office & IT Relocation Programme

Harrow Green’s Croydon team was appointed by Global Outdoor Media Limited to deliver the relocation of contents from a 70,000 sq ft warehouse, alongside associated office and staff moves.

The programme combined a wide range of services, including warehouse packing and unpacking, staff relocation, IT decommissioning and recommissioning, furniture installation and project management.

Delivered across several carefully planned phases, the works included preparing warehouse stock for transport, relocating office furniture and equipment, installing furniture at the new premises and coordinating the movement of specialist items.

Client: Global Outdoor Media Limited

Location: Enfield, London

Sector: Commercial Relocation

The Challenges

The scale of the warehouse operation required the move to be carefully sequenced around the client’s ongoing activities, with multiple vehicle movements and teams working across different phases.

Warehouse stock included a mixture of palletised goods, cages and specialist items, each requiring the appropriate handling and securing method for transport. Large glass panels also required additional protection and specialist handling.

Alongside the warehouse relocation, office furniture, staff belongings and IT equipment had to be transferred and set up in line with the wider programme, creating several interdependent workstreams that needed to remain coordinated.

The Solutions

Harrow Green developed a phased relocation programme, allocating dedicated teams to packing, furniture installation, warehouse relocation and office moves.

Our packing teams worked alongside Global Outdoor Media to prepare warehouse contents ahead of each move phase, while the client’s warehouse team supported forklift loading of pallets and cages. Harrow Green then took responsibility for securing each load for safe transportation and onward delivery.

Specialist glass panels were secured to A-frames prior to transport, while furniture teams dismantled, relocated and installed desks and other office assets at the new site.

IT equipment was separately packed and managed through the decommissioning and recommissioning process, helping maintain control of technology assets throughout the transition.

A dedicated project management approach brought the different teams, vehicles and move phases together, allowing resources to be adjusted as the programme progressed.

The Outcomes

The phased approach enabled the relocation of the 70,000 sq ft warehouse operation and associated office functions to be managed as one coordinated programme.

By combining warehouse logistics, commercial removals, IT services, specialist handling and furniture installation, Harrow Green provided Global Outdoor Media with a single coordinated relocation solution.

The project demonstrates the Croydon team’s capability to manage large-scale operational relocations involving multiple workstreams, balancing detailed preparation with the flexibility required to keep a complex move programme progressing efficiently.