Search

Call us today and speak to one of our relocation experts
0345 603 8774

up

Birmingham

Harrow Green

Unit 3 Bromford Central, Bromford
Lane, West Midlands
B8 2SE
Phone: +44 (0) 121 326 0810

Details

Bristol

Harrow Green

3 Dean House, Dean Road Trading
Estate Avonmouth
BS11 8AT
Phone: +44 (0) 121 326 0810

Details

Croydon

Harrow Green

Eagle House, Waddon Industrial
Estate 3b Princes Way
CR0 4RD
Phone: +44 (0) 20 8633 1800

Details

Glasgow

Harrow Green

Unit 3B Milnpark Trading Estate
12 Lambhill Quadrant, Kinning Park,
Scotland G41 1SB
Phone: +44 (0) 141 419 7070

Details

Leeds

Harrow Green

Unit 22, Millshaw Industrial Estate
Millshaw Park Lane, Yorkshire
LS11 0HF
Phone: +44 (0) 113 272 6460

Details

London

Harrow Green

2 Oriental Road
E16 2BZ

Phone: +44 (0) 207 540 6500

Details

Manchester

Harrow Green

Unit 3, Europa Triangle
John Gilbert Way
M17 1FP
Phone: +44 (0) 161 669 5020

Details

International Moving
& Storage

Harrow Green

2 Oriental Rd, London
E16 2BZ

Phone: +44 (0) 207 540 6570

Details

ITP Group

Harrow Green

Unit 1
Stadium Way, Tilehurst, Reading
RG30 6BX
Phone: +44 (0) 1189 438 001

Details

IT Efficient

Harrow Green

Units 4B-4F, Shefford Industrial Park,
St. Francis Way, Shefford,
Bedfordshire, SG17 5DZ
Phone: +44 (0) 1462 813 132

Details

Relocom

Harrow Green

Units 4B-4F Shefford Industrial Park,
St. Francis Way, Shefford,
Bedfordshire, SG17 5DZ
Phone: +44 (0) 345 3131 491

Details

Harrow Green Business Relocation image

Business Relocation

print

Business Relocation North East Technology Park Research Institute

case studies

North East Technology Park (NETPark) Research Institute

Harrow Green Case Studies - The North East Technology Park

handshake vectorThe Client:

The North East Technology Park (NETPark) houses innovative, high-tech companies and provides a dynamic and supportive environment to accelerate their growth into global markets. The NETPark Research Institute was the first building opened at NETPark. Commissioned by Durham University, it houses two world-class research groups from the University:

  • The Advanced Inorganic Materials Group ‘grows’ large-diameter crystals to develop high-energy, colour X-ray imaging technology.
  • The Centre for Advanced Instrumentation creates advanced astronomical instrumentation for major telescopes around the world and has helped Durham University to achieve a worldwide impact on space science research.

target vectorThe Project:

For this large and complicated move, the entire contents of the building (which houses advanced scientific projects) had to be moved to another site in the Science Park. As well as moving their office furniture and IT, we used specialist techniques and materials to pack and move their huge array of scientific equipment including microscopes, Nanotech equipment, cryogenic chambers, optical tables, a 350 FG Ultra-Precision 3 Axis Free Form Machining System, wavefront sensors, optical interferometry equipment, a Zygo measuring system and a Bode Flexure rig which weighs approximately 12 tons.

To allow movement of the larger items of equipment and machinery, we used 7t forklift trucks and specialist handling kit including a genie hoist, machine skates and pump trucks. Crash deck scaffolding was installed to allow the movement and installation of optical tables through a first-floor access area, to allow them to be manoeuvred into position within the temporary facility.

The technical equipment moved had a total replacement value of £4.5 million.

This move needed highly specialised knowledge and experience. We have carried out equally complicated projects before, and have a wealth of knowledge of the equipment and techniques needed, so the client chose us to carry out their extremely complex move.

building vectorThe Outcome:

We completed this massively complex move with no problems. All the equipment, however large or delicate, was carefully transported and installed in place, precisely as requested by our client.

We planned everything carefully in full liaison with our client and the other necessary contractors, succeeding in a real team effort. There were some changes to our client’s programme of works but we took these in our stride, and our expert team completed the project on time and within budget.

Our client was particularly impressed by our flexibility, our diligence, and our efficiency, and we have been asked to give a quotation for the move back in a year’s time (after essential work to the building has been carried out).

Quotation markClient Feedback:

I would like you to pass on my sincere thanks to all of the team who participated in Durham University’s move from the NETPark Research Institute. Moving the entire contents of the building has been quite a project but one that you have carried out professionally, competently and courteously at all times. The communication has been excellent throughout and where small delays or unexpected situations did arise, you and the team have resolved them quickly and without fuss.I will have no hesitation in recommending Harrow Green to my colleagues within the University and throughout the wider astronomy instrumentation community. I sincerely hope you and your team will be available to move us back into the Institute next year.

Paul Clark BEng (Hons) CEng MIET - Head of Engineering for the Centre for Advanced Instrumentation
NETPark Project

Project Details


Location:

Durham

Sector:

Higher education/Science and technology

What We Did:

  • Packed, moved and unpacked office furniture, IT and laboratory equipment
  • Used specialist handling apparatus to transport scientific equipment, including cryogenic chambers, optical tables, wavefront sensors, a Zygo measuring system and a Bode Flexure rig
  • Supplied and installed access platforms
scrolltop